Section,Field,What to record,Configuration A entry,Configuration B entry,Agreed criterion / document reference,Evidence file IDs,Result / responsible person and date Record,Record ID / actual inspection date,Assign the project record ID and actual observation date; the template version is not a test date.,,,,, Record,Template version,"Blank template v1.0, 6 November 2026. This sheet contains no completed tests or universal tolerance.",,,,, Record,Scope and safe use,"Agree the inspection method first. Stop for uneven travel, binding, unusual noise or damage. Do not change tension or limits to complete this sheet.",,,,, Configuration,Order and project reference,"Use the quotation, purchase order or sample-approval reference for each candidate.",,,,, Configuration,Full product name and model / SKU,Identify each complete screen configuration. A series name alone is not a model approval.,,,,, Configuration,"Serial, sample or batch ID",Record the safely accessible or documented identifier; retain label-photo references.,,,,, Configuration,"Material name, code and batch","Keep sample, quotation and supplied screen tied to the same surface code; record differences between candidates.",,,,, Configuration,Image size and aspect ratio,"Record visible width and height in mm, diagonal and aspect ratio. Do not use casing dimensions as image dimensions.",,,,, Configuration,Screen structure and installation,"Record tab-tensioned, non-tensioned or other structure and the installed mounting arrangement.",,,,, Configuration,Drawing and manual revisions,"Record document IDs, revisions and the approval applicable to each configuration; write unknown if unavailable.",,,,, Settling time,Approved inspection procedure,Identify the model instructions or agreed procedure and the person authorizing its use.,,,,, Settling time,Deployment and settling,"Record actual deployment time, prescribed settling period and inspection start/end. Disclose differences between candidates.",,,,, Settling time,Observation-window stability,Describe any movement during the agreed observation window; do not invent a standard waiting time.,,,,, Viewing distance,Viewing-position IDs,"Identify centre and relevant side seats; record distance in m, angle and eye height where needed.",,,,, Viewing distance,Critical viewing task,Name the task and content to be judged at each agreed seat; distinguish an audience observation from a close-up photo.,,,,, Test pattern,Pattern and content references,"Record filenames and versions for grid, text, horizontal/vertical lines and white/grey field; retain identical source content for a controlled comparison.",,,,, Test pattern,Reference sample / photos,Identify the signed sample or agreed reference photos used for acceptance.,,,,, Test pattern,Grid and line observations,"Record location, direction and appearance of visible distortion at the agreed seats; keep cause separate from observation.",,,,, Test pattern,Text readability observations,"Record the selected text, display scale and seat-specific readability result.",,,,, Lighting and projector,Projector and lens,Record actual projector and lens model plus relevant settings; note changes between configurations.,,,,, Lighting and projector,Throw type and geometry,"Record standard/short/UST or rear projection, throw distance, visible width, lens height/offset and surface orientation; cite compatibility confirmation.",,,,, Lighting and projector,Image settings,"Record image mode, brightness setting, resolution and any geometry correction used.",,,,, Lighting and projector,Room lighting and environment,"Record light sources/direction, curtains/daylight and relevant temperature/airflow conditions; disclose changes between inspections.",,,,, Lighting and projector,Optical observations,"Record hotspot, sparkle, moire or visible brightness variation separately from mechanical waves; do not calculate performance percentages from photos.",,,,, Left/right tension tracking,"Left edge, centre and right edge",Record already-observed tracking and retain photos. Use not applicable for a configuration without side cables or tabs.,,,,, Left/right tension tracking,Binding or asymmetric behavior,"Record warning signs, stop status and referral. Do not run a suspect screen again for a photograph or video.",,,,, Dimensions and alignment,"Visible width, height and drop",Record measurements safely obtained by the responsible installer and the applicable drawing tolerance.,,,,, Dimensions and alignment,Housing and bottom-bar alignment,Record alignment evidence and any deviation against the approved installation drawing.,,,,, Evidence package,Original image / recording IDs,"List original files with order, model, size, material, date and viewing-position identifiers. Retain at least left, centre and right inspection photos where safely obtainable.",,,,, Evidence package,Conditions or configuration differences,"List changes in surface, size, geometry, light, camera or installation that limit direct comparison; do not attribute every difference to side tension.",,,,, Evidence package,Agreed acceptance criteria,Record the criteria agreed before the test and the document or sample reference. No universal flatness tolerance is supplied by this template.,,,,, Evidence package,Result and unresolved items,Enter an observed result only after assessment; mark untested items not assessed. Keep exceptions and required follow-up visible.,,,,, Evidence package,Buyer and supplier review,"Record the responsible reviewers, decision, actual date and signed approval reference. An unreviewed sheet is not a completed acceptance.",,,,,