Field / check,Information to record,Project entry,Evidence / document revision,Responsible reviewer / decision / date Batch identity,"Order/model/serial or batch, material code/lot and approved drawing/BOM revision.",,, Surface preparation,"Relevant preparation inspection, method/criteria revision, observer and photo ID.",,, Tension components,Specified side tabs/lines/attachments and assembly evidence; no unapproved adjustment values.,,, Bottom bar / travel,Assembly/clearance and permitted movement/limit test observations against matching instructions.,,, Viewing conditions,"Inspection distance/angle, light, deployed condition and reference photos.",,, Disposition,"Observed defect, agreed criterion, correction/retest and authorized release.",,, Site handoff,Actual projector/installation checks left for site; associated model documents and unresolved items.,,,