MGF Projection Screen Project Direction
Hotel Ballroom Projection Screen Project
This hotel ballroom planning baseline supports conferences, weddings, banquets and changing event layouts while keeping daily operation, reset and storage practical for venue teams.

Project Planning Baseline
This baseline provides practical starting parameters for screen selection, installation planning and quotation. Final engineering follows the approved room drawing, projector data and mounting conditions.
| Country / market | UAE |
|---|---|
| Venue type | Hotel Ballroom |
| Screen type | Large Electric Screen |
| Room / venue baseline | 24 m W × 18 m D × 6 m H ballroom |
| Capacity | 250–400 seats |
| Viewing distance | 10–24 m from the front screen line |
| Screen size / aspect ratio | 180 in, 16:9; approx. 3.98 m W × 2.24 m H viewing area per screen |
| Quantity | 2 large electric screens for balanced room coverage |
| Installation method | Ceiling or truss-mounted housings with structural support, service access and protected power routes |
| Control / AV integration | Central room-control presets through RS-232/relay, with local override for event technicians |
| Delivery / warranty baseline | 5–7 weeks after approved rigging, electrical and finish drawings; 2-year warranty allowance |
The Project Requirement
The following direction translates the venue conditions into a screen package that a buyer, AV integrator or facility team can use as a starting point:
Buyer Need
- Large-screen viewing for guests seated across a wide room.
- Reliable operation for event teams and venue staff.
- A screen system that adapts to different event formats while keeping the floor clear.
MGF Solution Direction
- Two 180-inch 16:9 large electric screens for a 24 m × 18 m ballroom baseline.
- Central presets for deploy, retract and event changeover, with local technical override.
- Structural and service planning for large housings so screen stability and maintenance access are protected.
Planning Inputs
- Ballroom drawing, ceiling height, projector throw, event seating plan and required screen separation.
- Changeover schedule, storage policy, local technician access and room-control protocol.
- Structural support, power route, maintenance clearance, quantity and the 5–7-week delivery allowance.
Installation and AV Integration
Ceiling or truss-mounted housings with structural support, service access and protected power routes. Central room-control presets through RS-232/relay, with local override for event technicians. These provisions should be coordinated with the approved room drawing, projector position, power access and local structural requirements before production.
Project Result and Buyer Takeaway
Planning outcome: Repeatable event changeover with both screens retracting into their housings and no floor storage during room resets. The baseline also includes 5–7 weeks after approved rigging, electrical and finish drawings; 2-year warranty allowance.
For a quotation, send the venue drawing, projector information, ambient-light conditions, installation constraints, control-system requirement and target delivery date. MGF can then convert this planning baseline into a final size, material, mounting and commercial specification.
Request a Project Recommendation
Share the project conditions and receive a practical screen recommendation with the required size, material, installation and quotation inputs.
Recommended Products
These MGF screen formats are selected for the room, viewing distance and installation direction described in this case.
Related Case Studies
Review other MGF project directions with comparable screen, venue or AV-planning requirements.

Church ProjectCanada · Motorized ScreenThis church planning baseline provides wide-seat coverage for lyrics, video and presentation content while keeping motor operation discreet and service routines repeatable.View project →

Exhibition CenterUSA · Portable Folding ScreenThis exhibition planning baseline balances a large presentation surface with transport, fast deployment and repeat use across visitor-facing event schedules.View project →

Corporate OfficeGermany · Motorized Tab-Tension ScreenThis corporate meeting-room planning baseline is sized for clear presentation content, quiet daily operation and a clean screen position that works with conference cameras, lighting and furniture.View project →




