Project Planning Baseline

This baseline provides practical starting parameters for screen selection, installation planning and quotation. Final engineering follows the approved room drawing, projector data and mounting conditions.

Country / marketUAE
Venue typeHotel Ballroom
Screen typeLarge Electric Screen
Room / venue baseline24 m W × 18 m D × 6 m H ballroom
Capacity250–400 seats
Viewing distance10–24 m from the front screen line
Screen size / aspect ratio180 in, 16:9; approx. 3.98 m W × 2.24 m H viewing area per screen
Quantity2 large electric screens for balanced room coverage
Installation methodCeiling or truss-mounted housings with structural support, service access and protected power routes
Control / AV integrationCentral room-control presets through RS-232/relay, with local override for event technicians
Delivery / warranty baseline5–7 weeks after approved rigging, electrical and finish drawings; 2-year warranty allowance

The Project Requirement

The following direction translates the venue conditions into a screen package that a buyer, AV integrator or facility team can use as a starting point:

Buyer Need

  • Large-screen viewing for guests seated across a wide room.
  • Reliable operation for event teams and venue staff.
  • A screen system that adapts to different event formats while keeping the floor clear.

MGF Solution Direction

  • Two 180-inch 16:9 large electric screens for a 24 m × 18 m ballroom baseline.
  • Central presets for deploy, retract and event changeover, with local technical override.
  • Structural and service planning for large housings so screen stability and maintenance access are protected.

Planning Inputs

  • Ballroom drawing, ceiling height, projector throw, event seating plan and required screen separation.
  • Changeover schedule, storage policy, local technician access and room-control protocol.
  • Structural support, power route, maintenance clearance, quantity and the 5–7-week delivery allowance.

Installation and AV Integration

Ceiling or truss-mounted housings with structural support, service access and protected power routes. Central room-control presets through RS-232/relay, with local override for event technicians. These provisions should be coordinated with the approved room drawing, projector position, power access and local structural requirements before production.

Project Result and Buyer Takeaway

Planning outcome: Repeatable event changeover with both screens retracting into their housings and no floor storage during room resets. The baseline also includes 5–7 weeks after approved rigging, electrical and finish drawings; 2-year warranty allowance.

For a quotation, send the venue drawing, projector information, ambient-light conditions, installation constraints, control-system requirement and target delivery date. MGF can then convert this planning baseline into a final size, material, mounting and commercial specification.

Request a Project Recommendation

Share the project conditions and receive a practical screen recommendation with the required size, material, installation and quotation inputs.

Request a Hotel Ballroom Projection Screen Recommendation

These MGF screen formats are selected for the room, viewing distance and installation direction described in this case.

Review other MGF project directions with comparable screen, venue or AV-planning requirements.